Transport gratuit la punctele de livrare Pick Up peste 299 lei
Packeta 15 lei Easybox 20 lei Cargus 25 lei FAN 25 lei

Project Scheduling to Maximize Positive Impacts of Reconstruction Operations

Limba englezăengleză
Carte Carte broșată
Carte Project Scheduling to Maximize Positive Impacts of Reconstruction Operations Andrew D Chaney
Codul Libristo: 08143658
Editura Biblioscholar, octombrie 2012
Since the decline of the Cold War, the risk of major con-ict between powerful industrialized nations... Descrierea completă
? points 157 b
317 lei
În depozitul extern Expediem în 14-18 zile

30 de zile pentru retur bunuri


Ar putea de asemenea, să te intereseze


Since the decline of the Cold War, the risk of major con-ict between powerful industrialized nations has signi cantly decreased. Insecurity in the twenty- rst century is forecast to arise rather from the debris of imploding states. Such situations may require intervention | military or otherwise | by concerned states, and the frequency with which these interventions occur is increasing. To meet this new operational challenge, the US military must adapt its planning procedures to account for Security, Stabilization, Transition, and Reconstruction Operations (SSTRO).

Informații despre carte

Titlu complet Project Scheduling to Maximize Positive Impacts of Reconstruction Operations
Limba engleză
Legare Carte - Carte broșată
Data publicării 2012
Număr pagini 136
EAN 9781249835059
ISBN 9781249835059
Codul Libristo 08143658
Editura Biblioscholar
Greutatea 254
Dimensiuni 189 x 246 x 7
Dăruiește această carte chiar astăzi
Este foarte ușor
1 Adaugă cartea în coș și selectează Livrează ca un cadou 2 Îți vom trimite un voucher în schimb 3 Cartea va ajunge direct la adresa destinatarului

Logare

Conectare la contul de utilizator Încă nu ai un cont Libristo? Crează acum!

 
obligatoriu
obligatoriu

Nu ai un cont? Beneficii cu contul Libristo!

Datorită contului Libristo, vei avea totul sub control.

Creare cont Libristo