Nu se pretează? Nu contează! La noi puteți returna bunurile în 30 de zile
Cu un voucher cadou nu veți da greș. În schimbul voucherului, destinatarul își poate alege orice din oferta noastră.
30 de zile pentru retur bunuri
The 2008 National Defense Authorization Act requires the Secretary of the Air Force to task a federally funded research and development center to conduct an engineering analysis on modifying KC-135R and KC-10 tanker aircraft with winglets and submit a report to the congressional defense committees by May 1, 2009. This research summarizes the main issues that decision-makers should consider in the investment in a winglet modification program. The factors that should be included in any decision, such as fuel costs, aircraft utilization, and life-cycle costs are enumerated.Using historical flight data from AMC's Global Decision Support System-2 and fuel reports from one of AMC's super tanker wings, a cost-benefit analysis is developed to aid in the decision-making process. Although the addition of winglets to the KC-135R could reduce the future fuel expenditures between $177 million and $1.1 billion over the modification costs by 2042, the second-order effects to current infrastructure may diminish any potential savings achieved by the modification. Further analysis is required on a location-by-location basis to obtain the actual costs of these second-orders effects before any modification decision is made.